ABSTRACT OF  PHYSICAL WORK PROGRESS REPORT OF ID&R W.R. UNIT, JAIPUR

For the year 2016-17 (From 1-4-2016 to 28-02-2017)

S.

No

Name of Circle/

Division

Name of work

Detail of work done (Progress for the year 2016-17)

Up to last month

(Jan.2017)

   

During the month (Feb. 2017)

Total

(Col.

4+5)

Remarks if any

1

2

3

4

5

6

7

1

Director Dam

(A) Design and drawing approved/ vetted.

 

 

 

a) Medium Project

2

-

2

As per annexure (A)

b)Minor Project

1

-

1

As per annexure (A)

c)Anicut

-

1

1

As per annexure (A)

d) Micro Irrg. Project (FWC)

-

-

-

-

e) Anicut/ check dam (FWC)

-

-

-

-

(B) Hydrology Finalized

 

 

a)Medium Project

-

-

-

-

b)Minor Project

2

2

4

As per annexure (A)

c)Micro tanks (FWC)

-

-

-

-

d)Anicut

519

03

522

As per annexure (A)

e)Anicut/Check Dam(FWC)

-

-

-

-

f) Anicut under MJSA

3

-

3

As per annexure (A)

(C) Health status of Large Dams

 

 

 

 

a)Pre monsoon report

 

 

 

Health Status of Large Dams in Rajasthan based on pre monsoon report 2016. Report prepared & submitted to CE WRD, Raj. Jaipur Director Dam, Dam Safety, CWC, New Delhi and other this office letter No. 333-338 dt. 08.09.16

 

 

b)Post Monsoon report

 

 

Health Status of Large Dams in Rajasthan based on Post monsoon report 2015. Report prepared and submitted to CE, WRD, Jaipur, Director, Dam Safety, CWC, New Delhi and others vide this office letter No.170-175 dt. 9.6.2016.

2

Director Canal

(A) Status of Major and Medium Irrigation Project for Clearance in CWC.

-

-

-

Total 6 Nos. Projects are pending in CWC

 

 

 

 

 

 

1-Manoharthana Medium Irrigation Project Jhalawar.

 

Pending due to forest & Environment clearance.

Under process by CE, WR Zone, Kota

2-Andheri Medium Irrigation project Baran.

Inter State clearance from M.P. Pending.

3-Hathiyadeh Medium Irrigation Project Baran.

Inter State clearance from M.P. Pending.

 

4-Kalisindh multipurpose project Phase-II Distt. Jhalawar.

 

Pending due to forest and Environment clearance. Under process by CE, WR Zone, Kota.

5-Gurgaon Main Canal under Yamuna water Project for Bharatpur.

 

 

 

Observations conveyed to ACE, WR Zone, Jaipur vide letter No. 1334 dated 3-12-13 matter is pending due to not signing of (26.6.15) MOU by Haryana Government. Under process with Harayana Govt.

 

 

 

 

 

 

 

 

 

6-Dholpur lift Irrigation Project Dholpur

 

 

DPR is being reformulated on the basis of new irrigation techniques by ACE WR Zone, Jaipur. Pending in the ACE, WR Zone, Jaipur vide letter no 625/7/9/2016, 762 18/10/2016, and remainder no. 1183 dated 23.12.16 reply received on 6.1.17 from ACE WR Zone Jaipur and as desire project report got checked for portion of hydrology, Irrigation planning & Design of structures & findings send to ACE WR Zone Jaipur vide DC/PA/1433 dt. 08.02.17 for further needful. 

 

7- Parwan major multipurpose irrigation project Jhalawar revised DPR submitted to CWC on 17.1.2017

Under progress with CWC MOWR, GOI 

 

 

(B) Design and Drawing vetted.

 

 

 

 

 

 

i) Gates

45

10

55

As per annexure-A

 

 

ii)Gates structure

-

-

-

-

 

 

iii)Aqueduct

 

4

-

4

As per annexure A

1 no. aqueduct of Karawan distty. Of Bhimni MIP at RD 540 to 690 m. received on dated 13.12.16 from CE WR zone kota and sent under observation vide this office letter no. DC/1118 dt. 15.12.16.to CEWR zone Kota, reply is still awaited. 

 

 

 

iv)VRBS/DRBS

 

-

-

-

(i) After discussion with CE (north) Hanumangarh, standard Drawings for road bridges, most GOT were sent (standard Drawing no. SD/185 to SD/188 for span 4m, 6m., 8m., 10m., respectively for skew angle 35”) as ready reckoner & for finalizing the design at their own level vide letter no. 993 dated 23.11.16  (Matter dropped)  

(ii) 2 Nos. Bridges at RD 31765 & RD 37643 observation conveyed to CE (North) Hanumangarh vide letter No. 224 dt. 13.6.16 & reminder 597 dt. 1.9.16 , 631 dt. 09.09.16 & 769 dt 18/10/2016, 1106 dated 14.12.16, 1359 dt. 02.12.16 Reply is still awaited .

 

 

v)C.D. work

 

-

-

-

(i) Design of remedial measures to safeguard the canal siphon at 17 Km to 17.800 km of Arniyali Lift Minor of Bhadrai Lift Canal of Narmada Canal Project. Observation conveyed to CE,NCP, Sanchore vide No. 1599-1600 dt. 20.8.15, 1766-67 dated 28.9.15, 1879 dated 27.10.15, 2044-45 dated 26.11.15 & 2060 dt. 2.12.2015, 2229 dt. 14.1.16, 2363 dt. 19.2.16, 06 dt. 1.4.16,150 dt. 19.5.16 & 234 dt. 15.6.16, but reply is still awaited.( matter is dropped from pending list in month of August 2016)

 

 

vi)Cross regulator

 

19

-

19

As per Annexure-A

(i) Head regulator on Mewara Irrigation for LMC observation conveyed to ACE, WR Zone Udaipur vide letter No. 223 dt. 13.6.16, reminder 598 dt. 1.9.16, 760 dt. 17.10.16 and 1105 dated 14.12.16  reply received and under scrutiny.

(ii) vetting of design and drawings of cross regulator gates with embedded parts at km. 95.78 of CRMC, CAD (East) received on date 06.01.17 but design not enclosed so that the vetting process may be initiated reply is still awaited.

 

 

v)Section of canal

 

1

-

1

As per Annexure-A

(i) Change in the structure of Dholpalia Minor received on 7.12.16 from CE North HMH and sent under observations to CE north HMH vide this office letter no. 1088 dt. 8.12.16 & 1360 dt. 02.02.17 reply is still awaited.

 

 

d)Approval of DPR flood protection work

 

-

-

-

(i) DPR for lifting 100 Cusec water from Gurgoan Main Canal to Sikari Patti Dam Diversion, observation reply received but not satisfactory and same is being conveyed to ACE WR Zone, Jaipur vide No. 2154 dt. 30.12.15, 2348 dt. 17.2.16, 319 dt. 1.7.16, 599 dt. 01.09.16 & D.O No 757 dt 17/10/2016 Reply is still awaited.

(ii) DPR of Rayki: Left scheme of Som-Kamla-Amba Irrigation Project, observation conveyed to ACE, W Zone, Udaipur vide letter No. DC/147 dt. 19.5.16 , reminder 532 dt 12.8.16 ,760 dt 17/10/2016, 4074/31/08/2016, 1036 dt. 29.11.16  & 1176 dated 22.12.16 & 1407 dt. 03.02.17 but reply is still awaited. matter has been taken in DTS No. 10140 dt. 02.12.16 & same may be conveyed to secy. WR on 30.12.16 by CE SWRPD Jaipur

 

 

(e) Other works

 

-

-

-

(i) Design and Drawing of Surghata Feeder Irrigation Project Distt Ajmer was received on dated 28.10.15 and observation convey to SE WR Circle Ajmer vide no. 2005 dated 6.11.15, 2046 dated 26.11.15, 2163 dt. 4.1.16, 2364 dt. 19.2.16, 06 dt. 1.4.16,  151 dt.19.5.16, 1037 dt. 29.11.16,  1211-12 dated 04.01.17 & 1424 dated 06.02.17 but reply is still awaited. 

(ii) regarding less water Discharge from the outlets of chak 6 SLD to 14 SLD of Silwani distributory and regarding steep slop of canal bad revised on dated 13.01.17 and observation conveyed to CE WR North zone HMH vide letter no. 1305-06 dated 17.01.17 & 1315 dated 02.02.17 and matter under DTS no. 10221 dt. 12.12.16 but reply still awaited.

(iii) Proposal of widening of Balinda Ghat distt. Jhalawar to protect Jhalawar town from flood submergence received on dt. 30.01.17 and under scrutiny is in progress.     

 

 

(C)Details of Training

 

 

 

 

i)Training at OTS

5

6

11

ii)Training at IMTI Kota

64

10

74

iii)National / Inter-national level training

06

-

06

iv) E.S.T.I

44

04

48

3

Material Testing Division

1) Soil lab

1365

84

1149

 

2)Concrete lab

789

17

806

3)Chemical lab

162

26

188

                 

 

Director Dam

ID&R, W.R. Jaipur

    Monthly Progress Report ID & R Director(DAM & Canal) for the year 2016-17 (01-04-16 to 31-03-17)

कार्यालय निदेशक (बांध) आई.डी.एण्ड आर. जल संसाधन इकाई, जयपुर ।

क्रमांक/                                                                     दिनांक/

श्रीमान मुख्य अभियन्ता,

जल संसाधन विभाग,

राजस्थान, जयपुर।

विषयः- आई डी आर इकाई के कार्यो की भौतिक प्रगति प्रतिवेदन माह जनवरी  2017 तक का भिजवाने बावत।

महोदय,

उपरोक्त विषयान्तर्गत निवेदन है कि आई डी आर इकाई, जयपुर में किये गये कार्यो का माह जनवरी 2017 तक का भौतिक प्रगति प्रतिवेदन तैयार कर वास्ते आवश्यक कार्यवाही हेतु प्रस्तुत है ।

 संलग्न:- भौतिक प्रगति प्रतिवेदन ।          

                                                                भवदीय,निदेशक    

                                                              (बांध)आई.डी.एण्ड आर.

                                                              जल संसाधन इकाई,जयपुर।

क्रमांक:                                        दिनांकः

 

प्रतिलिपि श्रीमान् अधीक्षण अभियंता एवं डी.डी.ओ कृते मुख्य अभियंता, एस.डब्ल्यू.आर.पी.डी, जयपुर को सूचनार्थ प्रेषित है। 

संलग्न:- भौतिक प्रगति प्रतिवेदन ।  

                                                                  निदेशक (बांध)

                                                                  आई.डी.एण्ड आर.

                                                                जल संसाधन इकाई, जयपुर।


अधिकारियों की इनकंबेंसी सूचना (अधीक्षण अभियंता एवं अधीशाषी अभियंता) १५.११.१६

1

रिक्त

निदेशक बाँध

2701-001(नॉन प्लान)

2

श्री राजेंद्र अग्रवाल

अधीशाषी अभियंता

2701-001(नॉन प्लान)

3

श्री रामकेश मीणा

EE-ERD-1

2701-001(नॉन प्लान)

4

श्रीमती चन्द्रकान्ता जैन

EE-ERD-11

2701-001(नॉन प्लान)

5

श्री रविन्द्र सिंह छोकर

DD-CMD-1

2701-001(नॉन प्लान)

6

श्री संजय सेठी

DD-CMD-11

2701-001(नॉन प्लान)

7

रिक्त

EE

2701-001(नॉन प्लान)

8

श्री राजेश कुमार कालोरिया

EE-HDD

2701-005-02(नॉन प्लान)

9

श्री अनिल अम्बेश

अधीशाषी अभियंता

2701-004(नॉन प्लान)

10

श्री संजय अग्रवाल

अधीशाषी अभियंता

अलग हेड

11

श्री हितेन्द्र सिंह (अ.अ.)

अनुसंधान अधिकारी

2701-006(नॉन प्लान)

12

श्री सतपाल मीणा

निदेशक

2701-001(नॉन प्लान)

13

श्री रामहंस सैनी

अधीशाषी अभियंता

2701-001(नॉन प्लान)

14

श्री राजीव लोचन शर्मा

अधीशाषी अभियंता

2701-005-02(नॉन प्लान)

15

श्री अतुल जैन

अधीशाषी अभियंता

2701-001(नॉन प्लान)

16

श्री सुदेश रूप राय

अधीशाषी अभियंता

2701-005-02(नॉन प्लान)

17

श्री भगवान सहाय गुप्ता

अधीशाषी अभियंता

2701-001(नॉन प्लान)

18

श्री अनिल कुमार चोबिसा

अधीशाषी अभियंता

2701-005-02(नॉन प्लान)

19

श्री विकास शर्मा

अधीशाषी अभियंता

2701-005-02(नॉन प्लान)

 

सहायक अभियन्ताओ की इन्कमबेन्सी सूचना

क्र.सं.

 नाम कर्मचारी

  पद

कार्यालय का नाम

  मद    

1

श्री सुरेश चन्द गुता

सहायक अभियन्ता  

निदेशक बाॅध   

2701-001(नोन प्लान)

2

श्री धनराज वाधवानी

सहायक अभियन्ता

निदेशक बाॅध   

2701-001(नोन प्लान)

3

श्री अशोक कुमार नागोरी

सहायक अभियन्ता

निदेशक बाॅध   

2701-001(नोन प्लान)

4

श्री सुनिल कुमार गुप्ता 

सहायक अभियन्ता

निदेशक बाॅध   

2701-001(नोन प्लान)

5

श्री संदीप शर्मा

सहायक अभियन्ता

निदेशक बाॅध   

2701-001(नोन प्लान)

6

श्री सन्तोष कुमार गुप्ता

सहायक अभियन्ता

निदेशक बाॅध   

2701-001(नोन प्लान)

7

श्री शिवराम मीना

सहायक अभियन्ता

अ.अ. द्रव्य परिक्षण     

2701-004(नोन प्लान)

8

श्री नवल किशोर दायमा

सहायक अभियन्ता

अ.अ. द्रव्य परिक्षण     

2701-01-06(नोन प्लान)

9

श्री अनिल कुमार

सहायक अभियन्ता

निदेशक नहर

2701-005-02 (प्लान)

10

श्री उपेन्द्र अवस्थी

सहायक अभियन्ता

निदेशक नहर

2701-005-02 (प्लान)

11

श्री आलोक शर्मा

सहायक अभियन्ता

निदेशक नहर

2701-001(नोन प्लान)

12

कु 0 नीलम कुमावत

सहायक अभियन्ता

निदेशक नहर

2701-001(नोन प्लान)

13

श्री किरोडी लाल

सहायक अभियन्ता

अ.अ.वा.ओ.ब.मा.

2701-005-02(नोन प्लान)

14

श्री सुनील कुमार खण्डेलवाल 

सहायक अभियन्ता

निदेेशक बांध   

2701-001(नोन प्लान